“DELAY RISK ANALYSIS OF PT ADARO INDONESIA CONSTRUCTION PROJECT - CASE STUDY ON PT ADARO INDONESIA TABALONG WATER AND MUD INSTALLATION PROJECT”. INTERNATIONAL JOURNAL OF CONSTRUCTION ENGINEERING (IJCE) 4, no. 1 (July 9, 2021): 16–26. Accessed March 14, 2025. https://lib-index.com/index.php/IJCE/article/view/IJCE_04_01_002.